Commissioning

Your Trusted Partner for Expert Commissioning Services

Commissioning Services at Irish Fluid Controls

At Irish Fluid Controls, we offer comprehensive commissioning services designed to ensure the seamless integration and optimal performance of your new systems to existing plant and Building Management Systems (BMS). Here are the key stages of our commissioning process:

Pre-Commissioning Planning and Documentation

The commissioning process begins with detailed planning and documentation to establish clear guidelines, objectives, and procedures. This stage ensures that all aspects of the project are thoroughly understood and that the necessary resources are in place.

Key Activities:

  • Developing comprehensive commissioning plans and schedules
  • Reviewing design documents and specifications
  • Identifying key performance indicators and success criteria
  • Assembling a dedicated commissioning team
  • Coordinating with all stakeholders and contractors

Before the actual commissioning starts, we confirm with site personnel that the project has been installed correctly and is ready for testing.

Key Activities:

  • Inspecting and verifying equipment and system installations
  • Checking alignment, connections, and mechanical integrity
  • Ensuring compliance with design specifications and standards
  • Documenting any discrepancies and implementing corrective actions
  • Preparing detailed inspection reports

Functional Testing and Calibration

Functional testing is a critical stage where each system and component is tested to verify that it operates as intended. Calibration ensures that all measurements and controls are accurate and reliable.

Key Activities:

  • Performing Site Assessment Test (SAT) on the system
  • Calibrating instruments, sensors, and control systems
  • Conducting performance tests under various operating conditions
  • Identifying and resolving any issues or malfunctions
  • Documenting test results and validating system performance

After confirming successful functional testing, we review that any external systems can be integrated. This stage ensures that all components work together harmoniously and that the overall system operates at peak efficiency.

Key Activities:

  • Integrating individual systems into the overall operational framework
  • Optimising system performance through fine-tuning and adjustments
  • Conducting end-to-end testing to ensure seamless operation
  • Implementing energy efficiency measures and performance enhancements
  • Training staff on system operation and maintenance

Final Validation and Handover

The final stage involves comprehensive validation to confirm that all systems meet the required standards and specifications. Once validated, the project is officially handed over to the client, complete with all necessary documentation and support.

Key Activities:

  • Conducting final validation tests and performance evaluations
  • Ensuring compliance with industry standards and regulatory requirements
  • Preparing and delivering detailed commissioning and validation reports
  • Providing comprehensive documentation and operational manuals
  • Handover to the client with full operational support and training

At Irish Fluid Controls, our commissioning services are dedicated to ensuring the successful deployment and operation of your systems. We are committed to delivering excellence at every stage, from planning and testing to final validation and support. Contact us today to learn more about how we can support your commissioning needs with expertise and precision.

Recent Projects

In this block you can get acquainted with our latest projects. We are your chemical feed expert. Follow us on LinkedIn.

Photo of chemical cleaning installation.

UCT

July 24, 2024

Photo of chemical cleaning installation.

Medtronic

July 24, 2024

BASF

July 24, 2024

Photo of chemical cleaning installation.

Snap

July 24, 2024

Photo of chemical cleaning installation.

Uisce Éireann

July 24, 2024

Okechamp

July 24, 2024

Photo of chemical cleaning installation.

Zoetis

July 24, 2024

Photo of chemical cleaning installation.

Zoetis

July 24, 2024

Okechamp

July 24, 2024

Photo of chemical cleaning installation.

Uisce Éireann

July 24, 2024

Photo of chemical cleaning installation.

Snap

July 24, 2024

BASF

July 24, 2024

Photo of chemical cleaning installation.

Medtronic

July 24, 2024

Photo of chemical cleaning installation.

UCT

July 24, 2024

Contact Irish Fluid Controls today